acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/vitruvius_882/public/web/wp/wp-includes/functions.php on line 6131
The National Catering Equipment Centre (NCEC) in Bristol provides 20,000 sq ft state of the art space which showcases products from leading equipment brands.
We were appointed well before beginning the internal fit-out, so were able to save time and cost through careful management of the site logistics
Ben Gwilliam
Vitruvius
Vitruvius was responsible for the overall project delivery providing programme, design team, construction, cost and health & safety management to ensure the client achieved an ambitious 16-week programme for fit-out of this large multi-functional space which includes 18,000 sq ft of exhibition space, a state of the art demonstration kitchen and a mezzanine floor with office and meeting room facilities.
This centre of excellence also includes a training and demonstration kitchen where an onsite development Chef is available to provide advice on equipment, menu development and on-site catering.